House Project!

November 17, 2016

So here we are, nearly 8 months since we bought our first home! We knew it needed work and we had a budget to work with but boy did we not realise what an undertaking it would be!!

We have fallen in and out of love with this house many times, out of love due to the hard, hard work it’s been (having done 95% of it ourselves every evening/weekend) and in love again more recently when we started to see massive changes. It looked like a building site for about 6/7 of those months and we just couldn’t live in it.

We very niavely thought it’d be finished in a couple months tops, oh how wrong we were! You come across things you didn’t envision like, uneven floors that need concreting, or a total re wire and re plumb! Especially when the house hasn’t been touched in 50 or so years!

but thankfully it’ll be ready in time for Christmas and we are putting our flooring down this weekend! Woohoo! No more concrete dusty floors!! Which gets EVERYWHERE! I really can’t wait to see normal dust! 

 

So here’s What we’ve done ourselves: (every weekend and spare evening since May)

  1. Installed ethernet in every room 
  2. Total re plumb of the entire house and change from oil to gas
  3. New water main
  4. Ripped up back garden (that was tough!)
  5. Doorways, wall and chimney taken down
  6. Created new channels in walls for new wiring and sockets/light switches
  7. New bathroom and wall removed between toilet and bathroom
  8. New window opening in bathroom
  9. New opening for bifolds
  10. Ripped up flooring and concreted it all to level it (my fave job!)
  11. Removed front wall and bushes to make drive for 2 cars (to be finished next year)
  12. Painted entire house – bought a spray gun!
  13. New led lighting everywhere
  14. New kitchen and new appliances installed (yet to get oven!)
  15. Floorboarded the entire attic
  16. Built cupboards for utility room to house our washing machine and tumble etc so it wouldn’t be noisy in our open plan living room
  17. New drainage to house (that was fun! not) had to get digger in and dig up the entire side of the house ourselves – clay soil!
  18. New flooring laid
  19. about 40 trips to the local skip
  20. about 5 8ton skips loaded
  21. New (concrete post ttongue and groove fencing (to be completed)

And tons of little stuff!

 

What we’ve hired tradesman for:

Re wire

Plastering

Electricity board remove cable from chimney

Windows fitted

Bifolds installed

Tree surgeon to remove tree roots

AND THATS IT!

 

(before images where the house is untouched are from estate agents)

House when we bought it!

_mg_0167

and now below (minus skip! ha) front wall and bushes ripped out so we could fit two cars! and eventually will be stone or tarmac drive (right) with sandstone (left) and a picket fence up the path. Our poor neighbours must be fed up (like we are) of looking at the our ugly drive! Luckily they are amazing people! Oh chimneys gone!

house-renov-015

 

Kitchen before!

_mg_0149

 

Kitchen during work

Doorways in to the kitchen and living room and the wall dividing the kitchen and living room (which had chimney) has been knocked down so we could make it open plan…

 

house-renov-027

house-renov-026

Hated this temporary kitchen! Always full of builders dust and no dishwasher! or oven 🙁

Neil made the stud wall above (middle) to fit our new kitchen…

image

Wheres Wolly? haha

(iphone pic above and below with Neil taking wall and chimney down!)

image

house-renov-030

If i took this photo before i’d be taking a picture of the wall below (left) (hole in ceiling boarded up from chimney)

Wall below (left) has gone and you can see the ‘kitchen’ to the left now as shown above.

_mg_0150

Not only has the wall gone above but so have the patio doors to make a bifolds hole! (below) 

house-renov-029

and Now below…! Plastering, painting and bifolds! YES! 7 months and nearly there!

house-renov-009

When you stand in the kitchen (above left) with the kitchen behind you, you now look at the wall below …

_mg_0152

which now looks like…

house-renov-004

 

Kitchen (below) now! (still has some protective film on some of which is blue! and obv half completed! there won’t be a gap at the top of the units, there will be a glass splash back, oven and microwave fitted (on the left panel) and so on… 

house-renov-008

house-renov-007

 

Bathroom Before! 

_mg_0145

DURING (iPhone)

image image

and now…!  It was a separate bathroom and toilet before and we have removed the windows and had one made to go across the entire wall which is also frosted….

house-renov-018

Neils first bathroom! haha and he loved every minute, not! especially my herringbone tile choice which wasn’t easy!

The toilet is also the only kind you can get that doesn’t have a cistern! most toilets that look like this have the cistern hidden but it would mean building a small wall to house it and we didn’t want to make the bathroom smaller so we kinda bought a little throne! :-0 ha bath is huge too, one of the things I really wanted!

house-renov-017

No taps! and you press the button on the wall to start shower and bath! Neil needs to get a thinner shower hose hence its hanging!

 

Front door (during)

house-renov-022

and now (yucky door will be going! and replaced with a porch and no internal door so you dont walk straight in and just see the wall opposite so it’ll have a better flow in to the house…

Neils installed a nest thermo – of course! (on wall)

house-renov-002

 

Spare bedroom! (iPhone)

She was a HEAVY smoker and the cobwebs were behind the wardrobe and brown with tar!! we had to sugar soap the ceilings because they were so coated and the plasterer said it won’t stick to it! :-0 it was gross, tar dripping from the ceiling when cleaning it.

I levelled the floor with concrete! Actually enjoyed this part – had to do it to the whole house as there was lots of dips! Some at least 30mm! This is now our temporary bedroom.

image

Theres a new blind,  bed and so on in here now…

image

 

A few more pics from different angles of the house during build…

house-renov-028

You can see in the right corner an imaginary door! this will be our new ‘garage’ bedroom door and the next to it on the left wall will be a door to my new office extension.

house-renov-025

Dougie getting involved

house-renov-021

Hallway to living room and kitchen, behind me is the bathroom and two bedrooms

house-renov-020

Spare bedroom above which is our temporary bedroom until we extend and make 2 more bedrooms…to make it 4, the garage will be our bedroom with ensuite and building a new bedroom/office with patio doors…

 

 

which will be to the right of the picture below and meet the back fence (this is an old picture!)

_mg_0159

Below left is where our bifolds are now (not the patio door you see) and where the person was standing taking this picture is where my office will be with patio doors so the L shape will have all glass windows. The shed has now gone and the garden is COMPLETE muddy mess!

Neil is adamant a hot tub will be going there and we will sandstone the entire back, the fence will be white picket too.

_mg_0157

 

home-008